How much does a London basement conversion cost?
Every project is priced per project: there are no fixed prices, because specification, size, waterproofing type and finish level all vary. Site visits and written quotes are always free, and the quote we send is the number we deliver to.
How long does a basement conversion take?
For a fresh excavation-to-completion project, 9 to 14 months is typical. A conversion of an existing structural shell is usually 4 to 8 months, depending on size and finish. Your programme is confirmed in writing at quote stage.
Do I need planning permission?
Some basement conversions fall under permitted development, but most substantial London basement projects, particularly those extending the footprint or including light wells, need planning permission. We can advise informally and work alongside your architect on the application.
What waterproofing warranty do I get?
25 years, backed by UHM as Delta Registered Waterproofing Installers. The structural warranty is also 25 years. Both are documented at handover.
Is the basement covered by building control?
Yes, every UHM conversion is delivered with building control sign-off and the completion certificate is included in your handover pack.
Can I live in the house during the conversion?
Usually yes, once the structural excavation phase is complete. We plan access, dust control and services around the family, but we're always honest about when the works make staying impractical.
Do you provide interior design?
We work alongside your architect and interior designer, or we can recommend trusted design partners. Our directly-employed joiners and finishing trades then execute the specification.
What if the existing basement was built by someone else?
We regularly convert basement shells built by other contractors, but only after a proper structural and waterproofing survey. We won't over-clad a failing waterproofing system, so a survey visit tells us both what's viable.