How much does damp proofing cost in London?
Priced per project. The number depends on the cause and scale of the damp, the system specified and the state of existing finishes. Site visits and written specifications are always free.
How long does a damp proofing job take?
A cellar-scale cavity drainage installation typically completes in three to six weeks. Isolated damp remediation is shorter; full-basement systems take longer. Programme is confirmed in the written quote.
Is damp proofing paint enough?
Almost never. Paints and coatings applied to damp masonry trap moisture and delay the symptom rather than solve it. We won't specify a paint job when a system is needed.
How do I know which damp type I have?
That's what the survey is for. Rising, penetrating and condensation damp look similar to the untrained eye but need different solutions. A proper diagnosis prevents you paying twice.
Do damp treatments come with a warranty?
Yes. Delta-registered installations carry a 25-year waterproofing warranty. Chemical DPCs and specific product treatments carry manufacturer-backed guarantees, all documented at handover.
Will the treatment involve stripping finishes?
Usually, in the areas being treated. Cavity drainage requires access to the wall face, and plastering is done fresh over the new membrane. We sequence works to minimise disruption elsewhere in the home.
Do I need mechanical ventilation as well?
Almost always, if the basement is habitable. Mechanical ventilation with heat recovery (MVHR) manages humidity properly. We specify it alongside the damp system, not as an afterthought.
Are you insured?
Yes, £10M all-risks insurance covering public and employers' liability. Documentation available on request.